Projects
Sonex Construction Group Ltd. constructs pipeline projects and facility tie-ins for various companies throughout Alberta. These projects range in size, up to 100 km in length. Sonex is capable of providing services up to 16" line pipe diameter and projects to $7.5 million.
Within each pipeline there are facility tie-ins and wellhead hook ups. We also supply services for steel and fiberglass pipe installation, have installed numerous process facilities and do maintenance work as required. Sonex is capable of providing shop welding and internal coating service through the Edmonton Branch.
The company is registered with the Alberta Boilers' and B.C. Boilers' Branch for design and fabrication of oil and gas process equipment, pressure vessels, and pipe spooling.
Since 2000, Sonex Construction Group Ltd. has been undertaking civil construction projects.
Sonex specializes in:
- Pipeline Installations and Repairs
- Pipe Fabrication
- Facilities Installations
- Compressor Stations
- Metering / Regulating Stations
- Dehydrator Packages
- Well-site Seperator Packages
- Piling Work
- Commissioning and Decommissioning
- Oil & Gas Processing Packages
- Civil Construction
- Water & Sewer Installations
- Water treatment plant construction
- Waste management facilities
- Subdivision site preparation
- Highway and road construction
- Environmental Control
- CAD
In all projects, Sonex Construction Group Ltd. strives to:
- Maintain quality and excellence to provide our client with a quality project in a safe and productive time frame.
- Maintain interests of individual landowners.
- Follow and adhere to government policies and programs.
- Maintain conservation of soil resources and agronomy.
- Maintain surface water quality.
- Protect public and private property.
Major Project Completions
2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 | 1999 | 1998 | 1997 | 1996 | 1995 | 1994 | 1993 | 1992 | 1991 | 1990
2007
ConocoPhillips
Ring Border, BC
3", 4" and 6" Well Tie-InsEpcor/The Crossing Company
Edmonton, AB
30" HDD, Weld and pipe supportIntrepid Energy
Whitecourt, AB
Well tie-ins and pipeline constructionTown of Devon
Devon, AB
Lift Station ReplacementNTN Developments/Westwynd
Alberta Beach, AB
Riding ArenaWaters Edge Developments
Alberta Beach, AB
60 lot Subdivision with Paved Roads2006
Result Energy
Worsely, AB
16km PipelineEscavar Energy Inc.
Fox Creek, AB
Well tie-ins and pipelineTriStar Oil & Gas Ltd.
Fort Saskatchewan, AB
Fiberglass and Steel Well Tie-insPetro-Reef Resources
Alexander, AB
Well Tie-insTriomphe Estates
Beaumont, AB
250 Lot subdivisionStonewood Terrace
Spruce Grove, AB
20 lot subdivision with paved road surfaceNTN Developments
Redwater, AB
40 Stall Campground complete with power, water & sewerSherwood Cove
Lake Isle, AB
20 lot subdivision with gravel roads and pumps2005
Nexen Inc.
NE British Columbia
8km 8”-6” line c/w LinerNorthern Sun
Central Alberta
Well Tie-InsBurlington Resources
Fort St. John, BC
Well Tie-InsCentury Estates
Spruce Grove, AB
3km Road Construction with AsphaltEstates on Fifth
North of Stony Plain Road
10 lot subdivision with pavingMD of Brazeau
Brazeau, AB
Upgrade 4km of resource roadNorth 43 Lagoon Commission
Gunn, AB
Sewage lagoon complete with Liner and pumps2004
Encana Resources
Andrew, AB
Wostok Pipeline Const. & Wellsite Separator InstallationVaquero Energy Ltd.
Various pipelines and Tie-InsSamson Canada Ltd.
Long Lake, AB
Compressor Station Upgrade2003
Encana Resources
Westerose, ABNexen Canada Ltd.
Liners and facilities in N.E. British Columbia
10km of double line 6"-8"-10" c/w liners and facilitiesSamson Canada Ltd.
Spirit River AB
Gas process facilitySentra Resources
Pigeon Lake, AB area
Steel and fiberglass pipelines2002
Tempest Energy Corp.
Red Earth, AB
50km 4", 6" & 8" PipelineBaytex Energy Ltd.
Red Earth, AB
4km 3" & 4" PipelineMidnight Oil & Gas Ltd.
Pigeon Lake, AB
12km 3" PipelinePurcell Energy Ltd.
750 HP Compressor & Process Facilities with Tank Farm2001
Talisman
Lac la Biche, AB
25km 4", 6" PipelineLM Resources
Edmonton, AB
4km 4" Pipeline and FacilitiesCompton Petroleum
Langdon, AB
40km 4" & 6" Pipeline and FacilitiesCanoil Resources
Morinville, AB
9km 4" Pipeline and FacilitiesHusky Oil
Slave Lake, AB
10km 4", 6" & 8" Pipeline2000
Atco Gas
Carbon, AB
Plant upgrades and 2km 18" PipelineRenaissance Energy
Wabasca, AB
17km 4" Plastic PipelineBaytex Energy Ltd.
Pigeon Lake, AB
Gas gathering projectRenaissance Energy
Westlock / Athabasca, AB
45km 4", 6" & 8" Pipeline and Facilities1999
Canadian Natural Resources Ltd.
Westlock / Athabasca, AB
40km 4" Pipeline and FacilitiesHusky Oil Ltd.
Athabasca, AB
2km 6" Pipeline, 2 Wellsite Facilities1998
Novagas Canada
Fort Saskatchewan, AB
10km 6" PipelineAtco Gas
Carbon Plant Upgrade
16" - 12" Piping ModificationsFletcher Challenge
St. Albert, AB
22km 6" Pipeline (Sour)Edge Energy Ltd.
Edson, AB
11km 4" & 6" Pipeline and Facilities1997
Elk Point Resources
Saddle Hills Project, AB
Installation of 24km 3", 4" & 6"Nova Gas Transmission
Devenish West Lateral and Devenish Meter Station, AB
Installation of 22km 6" pipeline1996
Paloma Petroleum Ltd.
Bezanson Gas Development
Installation of 7km pip and Wapiti River Crossing
1200Hp Compressor station1995
Praxair Canada Inc.
Hydrogen Pipeline - Fort Saskatchewan, AB
Installation 22km - 219 mm Hydrogen pipeline and associated tie-ins. (October)CS Resources Limited
Fusilier Battery, Lloydminster, SK
Fabrication of 22'x 40' Production Skid complete with vessel modifications.
Fabrication of 22'x 30' Water Pump Skid with specialized pipe coating and fiberglass lines.Pennzoil Petroleum Ltd.
Haro Gas Gathering, Paddle Prairie, AB
10km of 4" pipeline with Tie-Ins to existing facilitiesTalisman Energy Inc.
Chard, AB
1200 H.P. Compressor InstallationNorthwestern Utilities Ltd.
Mannville, AB
1000 H.P. Compressor Installation1994
Northwestern Utilities Ltd.
Fort Saskatchewan Salt Caverns, AB
Metering/Regulating facilities
Beaverlodge Regulating and Metering StationMobil Oil Canada
Pedigree Gas Plant
Shop fabrication of 1 utility skid package
1 MCC/Office building package
1 Pump building skidImperial Oil Resources Limited
Millarville, AB
Install 8km 3", 4", 6" pipeline in Kananaskis Reserve with Associated FacilitiesKer McGee Canada Ltd.
Bonanza, AB
Install 4km of 4" pipeline with Dehydrator InstallationFederated Pipe Lines Ltd.
Southlands to Pipeline Alley, Edmonton, AB
Fabrication and Installation of LACT skid and associated underground piping.
Fabrication and installation of new pigging facilities.
Pipeline tie-ins and hydro-testing of existing pipeline.Imperial Oil Resources Limited
Valhalla Gas Well Tie-Ins, Valhalla, AB
Installation of 14km of 6" pipe.
Fabrication and installation of associate wellsite facilities and group headers.1993
Northwestern Utilities Limited
St. Albert Metering Regulating Station, St. Albert, AB
Installation of 8" and 12" high pressure yard piping and metering buildingImperial Oil Resources Limited
Peco Gas Gathering System, Wolf Lake, AB
Installation of 15km of 6" pipe.Imperial Oil Resources Limited
Judy Creek Pipeline Installations - Phase 1, Judy Creek, AB
6.2km of 4" Surelok linepipe, 5.8km of 3" - 4" welded linepipe, 3km of 6" - 12" Zaplock linepipe
Installation of two internally coated Group header and Satellite piping modifications with tie-ins.Newport Energy Inc.
Redwater Gas System Pipeline Compressor Installation, Redwater, AB
6km of 4" and 6" pipeline
As per the contract Sonex crossed the Redwater river by method of directional bore, and installed 2 wellsite Separator packages and a compressor station consisting of an inlet separator dehydrator skid, flare stack, K/O drum and an Ingersoll Rand compressor.1992
Imperial Oil Resources Limited
Ricinus Gas Gathering System, Rocky Mountain House, AB
27km of 3" - 6" pipe installation and tie-ins.Imperial Oil Resources Limited
Judy Creek Gas Lift Replacements, Judy Creek Field, AB
9km of 3" - 8" pipe installation with manifolds and aerial cooler installation.Imperial Pipeline Company Ltd.
Ethane Pumping Station Facility Upgrade
Coordinated all aspects of upgrade, including the building foundation modifications, crane way extension and pressure piping modification.1991
Imperial Pipeline Company Ltd.
Upgrade Tank Farm at Nisku, AB1990
Imperial Pipeline Company Ltd.
Upgrade 25km of 219.1mm pipeline from Nisku to Edmonton, AB